Our friendly expert advice line : 01666 822059

          Monday – Friday 7.30am - 5.00pm

New Build (In-Screed)

Vysal offer a comprehensive range of In-Screed cables and In-Screed Cable Kits rated at 18W/linear m.inscreed cable kit

A concrete slab floor will be built in accordance with Building Regulation requirements and builder preference. It doesn’t matter if the thermal layer is above or below the slab. Lay out the heating cable following the principles described in the installation instructions and install the floor sensor before applying the final floor screed of at least 5 cm (2″) thickness. NB insert the floor sensor into the 10 mm diameter flexible conduit and check that the red plug used to seal the conduit is in place to prevent ingress of cement. Allow appropriate time to cure under normal conditions this is a minimum of 1 week per 25 mm of depth.

Floor plan

A beam and block floor will be constructed in accordance with minimum Building Regulation requirements and builder preference. Lay out the heating cable following the principles described in the installation instructions and install the floor sensor before applying the final floor screed of at least 5 cm (2″) thickness. NB insert the floor sensor into the 10 mm diameter flexible conduit and check that the red plug used to seal the conduit is in place to prevent ingress of cement. Allow appropriate time to cure under normal conditions this is a minimum of 1 week per 25 mm of depth.